---
title: "aerocms project vulnerabilities: CVEs, CISA KEV and security advisories"
url: https://radicalnotion.ai/vendor/aerocmsproject
type: vendor
description: "aerocms project has 21 published CVEs, 0 in CISA KEV and 21 with public exploits."
updated: 2026-05-10
source: RadicalNotion.AI
license: CC BY-NC 4.0 (https://creativecommons.org/licenses/by-nc/4.0/)
---

# aerocms project vulnerabilities

- **Published CVEs:** 21
- **In CISA KEV:** 0
- **With a public exploit:** 21
- **With a patch:** 0
- **Average CVSS:** 6.6
- **CVEs in the last two years:** 2
- **First CVE:** 2022-04-08
- **Latest CVE:** 2026-05-10

## Severity breakdown

| Severity | CVEs |
| --- | --- |
| Critical | 0 |
| High | 10 |
| Medium | 11 |
| Low | 0 |
| Unscored | 0 |

## Most affected products

| Product | CVEs |
| --- | --- |
| [aerocms](https://radicalnotion.ai/vendor/aerocmsproject/aerocms) | 21 |

## Most common weakness types

| CWE | Name | CVEs |
| --- | --- | --- |
| [CWE-89](https://radicalnotion.ai/cwe/cwe-89) | Improper Neutralization of Special Elements used in an SQL Command | 10 |
| [CWE-79](https://radicalnotion.ai/cwe/cwe-79) | Improper Neutralization of Input During Web Page Generation | 4 |
| [CWE-434](https://radicalnotion.ai/cwe/cwe-434) | Unrestricted Upload of File with Dangerous Type | 3 |
| [CWE-1021](https://radicalnotion.ai/cwe/cwe-1021) | Improper Restriction of Rendered UI Layers or Frames | 1 |
| [CWE-352](https://radicalnotion.ai/cwe/cwe-352) | Cross-Site Request Forgery | 1 |
| [CWE-22](https://radicalnotion.ai/cwe/cwe-22) | Improper Limitation of a Pathname to a Restricted Directory | 1 |
| [CWE-94](https://radicalnotion.ai/cwe/cwe-94) | Improper Control of Generation of Code | 1 |

## Assigning CNAs

| CNA | CVEs |
| --- | --- |
| [mitre](https://radicalnotion.ai/cna/mitre) | 19 |
| [VulnCheck](https://radicalnotion.ai/cna/vulncheck) | 2 |

## CVEs by year

| Year | CVEs published |
| --- | --- |
| 2022 | 18 |
| 2023 | 1 |
| 2024 | 0 |
| 2025 | 0 |
| 2026 | 2 |

## Latest CVEs

| CVE | Title | Severity | CVSS | EPSS | CISA KEV | Published |
| --- | --- | --- | --- | --- | --- | --- |
| CVE-2022-50944 | Aero CMS 0.0.1 PHP Code Injection via posts.php | high | 8.7 | 1.0% | No | 2026-05-10 |
| CVE-2022-50895 | Aero CMS 0.0.1 - SQL Injection | high | 8.8 | 1.1% | No | 2026-01-13 |
| CVE-2023-29847 | - | medium | 5.4 | 0.4% | No | 2023-04-14 |
| CVE-2022-46137 | - | high | 7.5 | 1.4% | No | 2022-12-16 |
| CVE-2022-46135 | - | high | 7.2 | 1.2% | No | 2022-12-16 |
| CVE-2022-46047 | - | medium | 4.9 | 0.8% | No | 2022-12-13 |
| CVE-2022-46061 | - | medium | 6.1 | 0.5% | No | 2022-12-13 |
| CVE-2022-46059 | - | medium | 6.5 | 0.4% | No | 2022-12-13 |
| CVE-2022-46058 | - | medium | 4.8 | 0.5% | No | 2022-12-13 |
| CVE-2022-46051 | - | high | 7.2 | 0.9% | No | 2022-12-13 |
| CVE-2022-45329 | - | high | 7.5 | 0.8% | No | 2022-11-29 |
| CVE-2022-45535 | - | medium | 4.9 | 1.0% | No | 2022-11-22 |

## Frequently asked questions

### How many CVEs does aerocms project have?

aerocms project has 21 published CVE records since 2022, including 2 in the last two years.

### How many aerocms project CVEs are in CISA KEV?

None of aerocms project's CVEs are currently listed in CISA's Known Exploited Vulnerabilities catalog.

### Which aerocms project products have the most CVEs?

The aerocms project products with the most published CVEs are aerocms.

### What are the most common weakness types in aerocms project CVEs?

aerocms project's CVEs most often map to these CWE weakness types: CWE-89 (Improper Neutralization of Special Elements used in an SQL Command), CWE-79 (Improper Neutralization of Input During Web Page Generation), CWE-434 (Unrestricted Upload of File with Dangerous Type), CWE-1021 (Improper Restriction of Rendered UI Layers or Frames).

### Are there public exploits for aerocms project vulnerabilities?

Yes — 21 of aerocms project's CVEs have a known public exploit.

### What is the average severity of aerocms project CVEs?

The average CVSS base score across aerocms project's scored CVEs is 6.6.

## Related vendors

- [Microsoft](https://radicalnotion.ai/vendor/microsoft) (51,292 CVEs)
- [Linux](https://radicalnotion.ai/vendor/linux) (26,637 CVEs)
- [Google](https://radicalnotion.ai/vendor/google) (18,745 CVEs)
- [Apple](https://radicalnotion.ai/vendor/apple) (15,987 CVEs)
- [Oracle](https://radicalnotion.ai/vendor/oracle) (15,004 CVEs)
- [Debian](https://radicalnotion.ai/vendor/debian) (10,248 CVEs)
- [IBM](https://radicalnotion.ai/vendor/ibm) (9,906 CVEs)
- [Red Hat](https://radicalnotion.ai/vendor/red-hat) (8,832 CVEs)

---

Source: [RadicalNotion.AI](https://radicalnotion.ai/vendor/aerocmsproject). Licensed CC BY-NC 4.0; attribute RadicalNotion.AI and link the source page when you reuse this data.
